Saturday, September 04, 2010

Retreat Progess 9/4/10

Today I worked on Piper's Polka Dots, a quilt for my 4-month-old granddaughter Piper.  The quilt will be quilted in two sections, then joined together.  I pieced together batting, pressed the quilt top sections, secured the edges of the polka dots, and pieced the backing.

Tomorrow I'll assemble the quilt sandwiches, zigzag applique the giant polka dots, then quilt each section.  I may get farther, but those are my targets for Sunday.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.